West Midlands

Full house renovation cost in Birmingham

Whole-house refurbishment — strip back, rewire, replumb, replaster and refinish a 3–4 bed property to a modern standard.

Local context — Birmingham

Council
Birmingham City Council
Open planning portal →
Cost premium
-8% vs UK average (West Midlands labour rates)
Typical extension price
A 25 m² single-storey rear extension in Birmingham typically runs £48,000-£72,000 (standard to premium, 2026). Mansard loft conversions in Edgbaston, Moseley and Harborne run £65,000-£95,000.
Building Control
Birmingham Building Consultancy is the council's in-house BC service. Booking lead time is 3-5 working days; competition from private Approved Inspectors (LABC, MD Insurance) is heavy in B13, B14, B17 and B30.
Conservation & Article 4
Birmingham has 30+ conservation areas including the Jewellery Quarter, Edgbaston, Moseley and Bournville. Article 4 directions in Bournville cover external materials, windows and rooflights — even PD-sized extensions need consent.
Local quirks that move the price
Cellars and Victorian sub-floors in Moseley/Kings Heath frequently require tanking specs adding £4-9k. Tree Preservation Orders are dense across south Birmingham (B13-B17) — always check before quoting rear excavation. Bay-fronted terraces in Selly Park typically need a Party Wall Award on both sides.
High-demand areas in Birmingham
MoseleyHarborneKings HeathEdgbastonSutton Coldfield
Typical 110 m² project in Birmingham
£88,629
to
£136,216
Mid-range (premium spec): £109,420
standard
£88,629
premium
£109,420
luxury
£136,216

What's typically included

Full house renovation costs in Birmingham — FAQs

How much does a full house renovation cost in Birmingham?

Full house renovations in Birmingham typically cost between £88,629 and £136,216 depending on size, specification and site conditions. A mid-range 110 m² project averages around £109,420.

How long will it take?

Most full house renovations take between 6 and 16 weeks on site, depending on scope, structural complexity and planning requirements in West Midlands.

Do I need planning permission?

Many full house renovations fall under permitted development, but conservation areas, listed buildings and larger projects in Birmingham can require a full planning application. Use the cost checker to see what applies to your address.

Get an instant estimate for your project

Answer 6 quick questions and we'll generate a full cost breakdown — line items, regional uplift, contingency and VAT.

Start my full house renovation estimate

Full house renovation in other UK cities

Other project costs in Birmingham

Get the Birmingham full house renovation cost guide

We'll email you this guide plus monthly UK renovation cost updates. No spam, unsubscribe anytime.

Disclaimer: This is an industry-informed estimate for guidance only — not a fixed quote, valuation, survey or legal advice. Figures are based on regional averages and the details you provided. Site-specific factors (access, ground conditions, structural surprises, planning constraints) can materially change the cost. Always confirm with a site inspection, written quotes from qualified tradespeople, and supplier pricing before committing to work. Build Price IQ (trading under Services R Us Ltd) accepts no liability for any decisions, costs, losses or damages arising from the use of these estimates.