• 1,200+
    Verified builders
  • 18,000+
    Homeowners served
  • < 90s
    Avg. estimate time
  • 4hrs / week
    Average time saved on quoting
Greater London

Rear extension cost in London

Single-storey rear extensions opening kitchens, dining and living space onto the garden — usually 30–50 m².

Local context — London

Council
Varies by borough (32 boroughs + City of London)
Open planning portal →
Cost premium
+18-25% vs UK average (inner London) / +8-15% (outer boroughs)
Typical extension price
A 25 m² rear extension in London typically runs £78,000-£125,000 (standard to luxury, 2026). Side-return extensions in Victorian terraces (Clapham, Islington, Hackney) cluster at £85-110k for a standard spec.
Building Control
Every London borough has its own Building Control; most homeowners use private Approved Inspectors (LABC, BBS, Stroma) for faster turnaround. Inspection lead time is 1-3 working days across most boroughs.
Conservation & Article 4
London has 1,000+ conservation areas. Article 4 directions are extensive across Camden, Hackney, Islington, Kensington & Chelsea and Westminster — assume PD rights are removed in any pre-1940 street until the borough confirms otherwise.
Local quirks that move the price
Parking suspensions (£40-110/day depending on borough) and CPZ dispensations are mandatory on most builds. Party-wall agreements typically needed on both sides for terraces. London Plan policy now requires sustainable urban drainage (SUDS) on most extensions over 5 m² of new hard surface.
High-demand areas in London
ClaphamIslingtonHackneyWandsworthLewishamEaling
Typical 40 m² project in London
£66,029
to
£106,632
Mid-range (premium spec): £86,340
standard
£66,029
premium
£86,340
luxury
£106,632

What's typically included

Rear extension costs in London — FAQs

How much does a rear extension cost in London?

Rear extensions in London typically cost between £66,029 and £106,632 depending on size, specification and site conditions. A mid-range 40 m² project averages around £86,340. London pricing reflects higher labour rates, parking permits and tighter site access.

How long will it take?

Most rear extensions take between 6 and 16 weeks on site, depending on scope, structural complexity and planning requirements in Greater London.

Do I need planning permission?

Many rear extensions fall under permitted development, but conservation areas, listed buildings and larger projects in London can require a full planning application. Use the cost checker to see what applies to your address.

Get an instant estimate for your project

Answer 6 quick questions and we'll generate a full cost breakdown — line items, regional uplift, contingency and VAT.

Start my rear extension estimate

Rear extension in other UK cities

Other project costs in London

Get the London rear extension cost guide

We'll email you this guide plus monthly UK renovation cost updates. No spam, unsubscribe anytime.

Disclaimer: This is an industry-informed estimate for guidance only — not a fixed quote, valuation, survey or legal advice. Figures are based on regional averages and the details you provided. Site-specific factors (access, ground conditions, structural surprises, planning constraints) can materially change the cost. Always confirm with a site inspection, written quotes from qualified tradespeople, and supplier pricing before committing to work. Build Price IQ (trading under Services R Us Ltd) accepts no liability for any decisions, costs, losses or damages arising from the use of these estimates.